Short answer. Florida requires every condo or co-op building of three or more habitable stories to get a milestone structural inspection by December 31 of the year it turns 30 (25 where the local building official says so) and every 10 years after, plus a structural integrity reserve study (SIRS) at least every 10 years, the first due by December 31, 2025. For budgets adopted on or after December 31, 2024, owners can no longer vote to waive or cut reserves for the roof, structure, plumbing, electrical and other SIRS items, which is why many buildings have raised fees or levied special assessments. On a resale you are entitled to the milestone summary and the latest SIRS, and you can cancel within 7 days (weekends and holidays excluded) after you receive them. I'm Brent Sharp, REALTORĀ®, broker and owner of Sharp Real Estate Group LLC: 26 years helping people buy and sell homes, 12,000+ homes valued. I work with buyers and sellers anywhere in South Florida and come to you to show homes and meet in person. Weighing a condo? I'll walk through its inspection, reserves and budget with you before you offer: call or text Sharp Real Estate Group LLC at (772) 272-9571.
Two buildings at the same price can carry very different futures: one with its repairs done and reserves funded, one with a large assessment ahead. The documents tell you which, and the law gives you a few days to read them. Here is what the laws require, how the three counties apply them, and what to check.
Sharp Real Estate Group LLC · Free · No obligation to list · A broker's opinion of value, not an appraisal
Condo safety laws, the numbers
Florida Statutes; Florida DBPR; Miami-Dade, Broward and Palm Beach County building programs; OPPAGA. Links in Sources.
What do Florida's condo safety laws require?
Two things, both created by SB 4-D in May 2022 and changed in 2023, 2024 and 2025. They apply to condo and co-op buildings of three or more habitable stories. Buildings with one to four units and three or fewer habitable stories are exempt.
| Rule | Milestone inspection (s. 553.899) | Structural integrity reserve study, or SIRS (s. 718.112(2)(g)) |
|---|---|---|
| What it is | A structural inspection of the building by a licensed architect or engineer | A study of what the main building parts will cost to replace and how much the association must save for them |
| When | By December 31 of the year the building turns 30, then every 10 years. A local building official can require it at 25 years. | At least every 10 years. The first was due by December 31, 2025 (or with a milestone inspection due in 2026, but no later than December 31, 2026). |
| How it works | Phase 1 is a visual exam, due within 180 days of the local notice. If it finds substantial structural deterioration, Phase 2 follows. Repairs must start within 365 days of the Phase 2 report. | Covers the roof, structure, fireproofing and fire protection, plumbing, electrical, waterproofing and exterior painting, windows and exterior doors, and any other item over $25,675 (the 2026 threshold) whose failure would affect them. |
| Who does it | A Florida-licensed architect or engineer | A licensed engineer or architect, or a credentialed reserve specialist (CAI Reserve Specialist or APRA Professional Reserve Analyst) |
| What owners get | The inspector's summary, mailed or delivered within 45 days and posted on the property | A copy or notice within 45 days of completion |
Are the rules different in Miami-Dade, Broward and Palm Beach?
Yes. State law sets the floor, and each county building department adds its own program. Cities with their own building departments run theirs.
| County | The local rule |
|---|---|
| Miami-Dade | Recertification has run since 1975 and was changed on June 1, 2022. Buildings built in 1993 or later recertify at 30 years, then every 10. Condos and co-ops of three or more stories within 3 miles of the coast, built in 1998 or later, recertify at 25 years. Single-family homes and duplexes are exempt. Each of the county's cities runs its own program. |
| Broward | The Board of Rules and Appeals policy 05-05, effective August 9, 2024, requires a safety inspection when a building reaches 25 years, then every 10, for most buildings, not only condos. Exempt: one- to four-family dwellings of three or fewer habitable stories, fee-simple townhouses and buildings under 3,500 square feet. |
| Palm Beach (unincorporated) | Condos and co-ops of three or more stories: 25 years within 3 miles of the coast, 30 years elsewhere, then every 10. Repairs must start within 365 days of a Phase 2 report. Cities with their own building departments run their own programs. |
South Florida carries most of the state's repair findings. In 2025, Miami-Dade's building officials reported 308 required Phase 2 inspections and Broward's reported 155, when most Florida counties reported fewer than 30 (OPPAGA, July 2026). Statewide, milestone inspections found 30 buildings unsafe or uninhabitable in 2024 and 24 in 2025. Treat those counts as a floor: 7 of 34 Miami-Dade cities, 7 of 31 Broward cities and 17 of 39 Palm Beach cities did not report 2025 data.
Why are condo fees and special assessments going up?
Because the reserves for the main building parts can no longer be skipped. For budgets adopted on or after December 31, 2024, owners may not vote to waive or reduce reserves for SIRS items, and the association may not spend that money on anything else (s. 718.112(2)(f)). Before that, many buildings voted every year to fund less, so some are catching up all at once.
The 2025 law, HB 913 (chapter 2025-175), gave associations some room:
- Other ways to pay. SIRS reserves can be funded by special assessments, lines of credit or loans, each approved by a majority of all voting interests, and shown in the financial statement buyers receive.
- A baseline plan. The SIRS must offer a baseline funding plan that keeps the reserve cash balance above zero each year, a lower floor than funding every item in full.
- A pause after a milestone inspection. For budgets adopted on or before December 31, 2028, if a milestone inspection was done in the prior 2 calendar years, a majority of all voting interests may pause or reduce reserve contributions for up to two consecutive annual budgets to pay for the repairs it found. A new SIRS is required before contributions resume.
A special assessment must be approved at a board meeting noticed at least 14 days ahead, with the estimated cost and purpose in the notice, and the money can be used only for that purpose (ss. 718.112(2)(c), 718.116(10)).
What could a SIRS mean for one unit's monthly cost?
Here is the arithmetic on an example building. The numbers are made up to show the math, not taken from a real association. A 120-unit building's SIRS puts the roof at $1,200,000 with 8 years of life left and concrete and balcony restoration at $3,600,000 with 10 years left.
| Way to pay | Building, per year | One unit |
|---|---|---|
| Roof saved for over 8 years ($1,200,000 ÷ 8) | $150,000 | $1,250 a year, about $104 a month |
| Concrete saved for over 10 years ($3,600,000 ÷ 10) | $360,000 | $3,000 a year, $250 a month |
| Both, added to the reserve line of the fee | $510,000 | $4,250 a year, about $354 a month |
| Concrete paid now by special assessment instead | $3,600,000 once | $30,000 once |
Real shares follow the declaration, often by unit size, not equal splits. The point for a buyer: read the SIRS funding schedule and the budget together, and ask whether any assessment has been voted, proposed or discussed. Who pays an assessment that is voted before closing is set by your contract, so agree on it in writing.
What documents does a condo buyer get, and can I back out?
On a resale, Florida law entitles you, at the seller's expense, to the declaration, articles, bylaws and rules, the annual financial statement and budget, the milestone inspector's summary, the latest SIRS (or a statement that none was done), the turnover inspection report where one exists, the association's question and answer sheet and the state's governance form (s. 718.503(2)).
- 7 days to cancel. You can cancel within 7 days, not counting weekends and legal holidays, after you receive the documents, unless you had them more than 7 such days before you signed.
- Contracts signed after December 31, 2024 must say in conspicuous type whether a required milestone inspection or SIRS has not been done, or that none is required. A contract that does not comply can be voided by the buyer before closing.
- New construction. Buying from a developer, the window is 15 days after you receive all the documents (s. 718.503(1)).
- Look it up yourself. Since January 1, 2026, associations with 25 or more units must post official records on a website, including the milestone summary and SIRS. The state keeps a list of associations that reported a completed SIRS: 7,836 had reported by November 30, 2025, out of 16,104 that had set up the required state account.
What should I check before I offer on a South Florida condo?
- The year the building's certificate of occupancy was issued, and whether its milestone inspection or county recertification is done, due or in Phase 2.
- The SIRS: the date, the funding plan the board chose, and the items with the shortest remaining life.
- The current budget's reserve line, and board minutes from the past year for any assessment, loan or line of credit.
- The master insurance policy's hurricane deductible, which can turn into an assessment after a storm. See home insurance in South Florida.
- Your 7-day window: put the document delivery date in writing so you know when it ends.
Browse buildings on Miami Beach condos or the county pages above, and read the documents before the window closes.
Before you offer on a condo
Want a building's inspection, reserves and budget read with you?
- Milestone status, SIRS date and funding plan, side by side
- Board minutes checked for assessments and loans
- Free. No obligation to buy or list, now or later.
Brent Sharp, Broker / Owner
Call or text (772) 272-9571 Ask Brent Text Brent
Licensed Florida real estate brokerage, DBPR license CQ1051669. Port St. Lucie, FL. A broker's opinion of value, not an appraisal.
What else do buyers ask about Florida's condo laws?
What is a milestone inspection in Florida?
A structural inspection by a licensed architect or engineer that condo and co-op buildings of three or more habitable stories need by December 31 of the year they turn 30, then every 10 years (section 553.899, Florida Statutes). A local building official can require it at 25 years. If Phase 1 finds substantial structural deterioration, a Phase 2 inspection follows, and repairs must start within 365 days of that report.
What is a SIRS for a Florida condo?
A structural integrity reserve study: a study, at least every 10 years, of the remaining life and replacement cost of the roof, structure, fireproofing, plumbing, electrical, waterproofing, windows and exterior doors, and how much the association must save for them (section 718.112(2)(g)). The first was due by December 31, 2025.
Can condo owners still vote to waive reserves in Florida?
Not for SIRS items. For budgets adopted on or after December 31, 2024, owners may not waive or reduce those reserves, and the money may not be used for other purposes (section 718.112(2)(f)). Under the 2025 law, owners can pause contributions for up to two budgets to pay for repairs found in a recent milestone inspection, if a majority of all voting interests agree.
Do these laws apply to a two-story condo or a townhouse?
Generally no. The milestone and SIRS rules cover buildings of three or more habitable stories, and one- to four-family dwellings of three or fewer habitable stories are exempt. Broward's own 25-year inspection program covers more building types but also exempts fee-simple townhouses.
Can I cancel a condo contract after I read the SIRS?
On a resale, yes, within 7 days (not counting weekends and legal holidays) after you receive the required documents, which include the milestone summary and the latest SIRS (section 718.503(2), Florida Statutes). From a developer, the window is 15 days.
How do I check whether a condo building finished its SIRS?
Ask the association, look at its website if it has 25 or more units (required since January 1, 2026), and check the Florida DBPR list of associations that reported a completed SIRS. As of November 30, 2025, 7,836 associations had reported one.
Does Miami-Dade still have 40-year recertification?
Miami-Dade's program changed on June 1, 2022. Buildings built in 1993 or later recertify at 30 years and then every 10, and coastal condos of three or more stories within 3 miles of the coast built in 1998 or later recertify at 25 years. Each city in the county runs its own program.
Who pays a condo special assessment when a unit sells?
Your contract decides. Ask the association whether any assessment has been voted, proposed or discussed, and agree in writing who pays it before you sign.
Sources
- The Florida Senate, SB 4-D (2022D), chapter 2022-269, effective May 26, 2022; SB 154 (2023), chapter 2023-203; HB 1021 (2024), chapter 2024-244; HB 913 (2025), chapter 2025-175, with the House final bill analysis dated June 26, 2025. Read November 20, 2026.
- The Florida Statutes (2026): section 553.899 (milestone inspections), section 718.112 (SIRS, reserves, meeting notice), section 718.116 (special assessments), section 718.503 (buyer documents and cancellation), section 718.111 (association websites). No 2026 law changed these sections beyond cross-references. Read November 20, 2026.
- Florida Department of Business and Professional Regulation, Reserve Threshold ($25,675 for 2026); Condominiums and Cooperatives SIRS Reporting; Compliance with HB 913 (2025) Requirements, December 1, 2025 (7,836 SIRS reported, 16,104 accounts, as of November 30, 2025). Read November 20, 2026.
- OPPAGA, Milestone Inspection Reporting Data 2024 and 2025, Report 26-04, July 2026. Read November 20, 2026.
- Miami-Dade County, Recertification (page undated). Palm Beach County Planning, Zoning and Building, Mandatory Milestone Inspections. Broward County Board of Rules and Appeals, Policy 05-05, effective August 9, 2024, as posted by the City of Pompano Beach. Read November 20, 2026.
General information, not legal advice. Brent Sharp is a real estate broker, not an attorney or engineer. Have a Florida real estate attorney review a condo contract and the association's documents, and rely on the building's own inspection reports and SIRS, not on the example numbers here.
Last updated · Reviewed by Brent Sharp, Broker